Project | Client | Scope |
Development of PC5 Report for 22 MW Jabban HPP | Habib Rafiq (Pvt) Ltd | Project close out Report with Analysis for WAPDA |
Design of 06 nos. New 33/11KV, 13.33MVA Substation Bangladesh | System Engineering Consulting Ltd UK | Technical Proposal Preparation and BOQ Development |
Jotun Paints Relocation | Jotun Powder Coatings Pakistan (Pvt) Ltd | EPCm of Relocation of Manufacturing Facility |
Project New Moon AkzoNobel Plant Relocation/New | Akzo Nobel Pakistan | Bid Review Engineering Consultancy |
HSE Study for Flood Protection | PepsiCo Int | Water Structures Integrity Study for Flood Protection |
Energy Substantiality Study | Style Textile | Biomass Boiler Replacement, Effluent and Low Velocity Wind Energy Potential Study |
Due Diligence of MDF Manufacturing | Formite- Thal Limited | Technical study of Plant & Equipment |
MEP Haiger Auto Bus Assembly Plant | Universal Auto Eng | MEP Design and PMC |
HSE Study for Ammonia System PSV Headers Adequacy | Unilever Walls | PSV discharge Headers sizing evaluation |
3D Model of Ammonia Piping System | Unilever Walls | 3D Model and ISO Metric drawings of Ammonia Piping System |
Process and Municipal Plumbing System | Business Tacts Int | Yasfeen Pharma |